The scope of the project covered two chemical plants and associated tank farms, silos and utility equipment. There was emphasis during the project to work closely with neighbouring production units owned by Basell that were still fully operational. Throughout the full project, RVA engineers demonstrated a thorough understanding and knowledge of all applicable regulations and standards. Health, Safety and Environmental considerations were always placed first and foremost in all aspects of their work. A very tight schedule was set and RVA worked to ensure that the project time-line tendered by the demolition contractor was constantly reviewed and updated throughout the project. RVA Consulting Engineers Ltd were an asset to the project and added value during the full period of the contract.